By choosing KR Wolfe, SITA received a secure and visually seamless AV installation of its flight information displays at LAX, ensuring travelers have accurate, uninterrupted wayfinding information and making the equipment and technology of tomorrow work today.

Safe, Secure Flight Information at LAX
Flight Information Displays
PROJECT
LAX Flight Information Displays, Los Angeles, CA
GOAL
Re-installed the original Flight Information Displays at LAX ensuring compliance with safety standards and operational guidelines.
CLIENT
SITA
DATE COMPLETION
9 days, August 2024
PROJECT DETAILS
-
Pre- and post-installation functionality testing of all displays
-
Safe deinstallation of 36 existing FID mounts
-
Installation of 35 new full-service video wall mounts
-
Installation of 35 Digital Data Communication (DDC) sets behind the screens
-
Site survey, repair, and replacement of 20 additional mounts
CHALLENGES
- Original FIDs were mounted directly to drywall without proper structural support
- Installation relied on self-tapping screws, which were insufficient for the weight and long-term stability of the displays
- Lack of wood backing compromised the safety and integrity of the mounting system
- Entire hardware system required removal and replacement to meet safety and building code requirements
- Structural reinforcement was needed behind finished surfaces without disrupting airport operations
- All installations had to be completed on 3rd shift to avoid heavy trafficked gates
- All technicians and tools needed to go through airport security

PROJECT RESULTS
Improved Safety Compliance
KR Wolfe ensured all Flight Information Displays (FIDs) were reinstalled to meet updated structural and safety requirements, minimizing risk and aligning with installation standards.
Enhanced Visual Presentation
Our team corrected misaligned and sagging displays, resulting in a clean, professional appearance that improves the traveler experience and supports brand consistency.
Reliable Long-Term Performance
By using industry-standard mounting techniques and proper structural support, KR Wolfe delivered a durable solution built for high-traffic, 24/7 environments.
Minimal Disruption
All work was completed with minimal impact to airport operations, showcasing KR Wolfe’s expertise in working efficiently within secure, active public spaces.

TESTIMONIAL
"Stephan and Andrena, it was a pleasure working with you both. We appreciate your attention to detail, timeliness and your flexibility on the job."
Project ManagerSITA
Ready to Elevate Your Next AV Systems Integration Project?
To get started, simply share your scope of work, bill of materials (BOM), and deadlines so we can design a solution that’s customized for you.