Skip to content
Centinnial Hills 2560X1140

SCALING UP TO MEET URGENT HOSPITAL RENOVATION NEEDS

Customize OR Ecosystem

 

PROJECT
Centennial Hospital, Las Vegas, NV, iSuite® OR Equipment Installation
GOAL

Successfully renovate ORs by delivering a complete iSuite® equipment installation on a fast-paced timeline, ensuring Level 4 infection control compliance and minimal disruption to hospital operations

CLIENT
Stryker
COMPLETION DATE
7 days, April 2025

PROJECT INFORMATION

Centennial Hills Hospital, a respected healthcare provider in Las Vegas, was gearing up to renovate two operating rooms, OR 1 and OR 2, on a fast-paced timeline. With limited availability of skilled technicians in the area, Stryker, a leader in medical innovation, needed a reliable partner to deliver a flawless iSuite® installation with limited disruption to the hospital’s operations.

Installation included:

  • Full iSuite installation
  • Equipment removal and replacement
  • Infection control – Level 4 compliance
  • Medical gas re-certification

CHALLENGES

  • Eliminate OR downtime to maintain uninterrupted patient care and hospital operations.
  • Maintain strict Level 4 infection control protocols throughout the renovation to protect patients, staff, and hospital operations.
  • Re-certify medical gas system.
  • Coordinate closely with hospital staff to maintain safety and minimize impact on surrounding operations.

PROJECT RESULTS

By choosing KR Wolfe, Stryker avoided delays and reinforced their reputation as a trusted solutions provider in surgical technology. The success of this project opened the door for our continued collaboration at Centennial Hills — a hospital recognized for award-winning care.

Improved Operational Efficiency
Seamlessly delivered a full Stryker iSuite® integration, complete with booms, surgical lights, and infection-control compliance, empowering Centennial Hills to serve more patients while maintaining the highest safety standards.
COMPLETED ON BUDGET
Delivered complete iSuite installation — including surgical booms, lights, integration, medical gas recertification, and Level 4 infection control — with zero budget overages.
DELIVERED ON SCHEDULE
Both ORs fully renovated, integrated, and ready for patient scheduling within the requested one-week window.
NO COMPLIANCE ISSUES
All infection control protocols met and verified, ensuring uninterrupted hospital operations and regulatory compliance.
website custome survey photo

How We Have Helped Our Clients Succeed

"I wanted to take a moment to highlight the incredible work Jason and Sam did on our Centennial Hills project, which wrapped up yesterday. From start to finish, their attention to detail, professionalism, and commitment to quality were truly exceptional.

 Although most of our projects in Las Vegas involve OR Renovations, this was one of my first projects with KR Wolfe—and I couldn’t be more impressed. Jason and Sam brought a level of expertise and work ethic that’s among the best I’ve seen. 

I’ll absolutely be requesting KR Wolfe for future projects."

Sales Representative, Stryker

READY TO RENOVATE WITH CONFIDENCE?

To get started, we recommend providing a statement of work, a bill of materials (BOM), and any expectations you’d like us to consider so we can tailor our approach to your needs.