Operating Room Renovation Services

KR Wolfe renovates operating rooms in hospitals and surgery centers while the rest of the surgical department keeps running cases. Equipment removal and replacement, medical gas recertification, modular ceiling work and Level 4 ICRA containment all fall under one contract. Every OR job gets a dedicated project manager.

The healthcare renovation team has spent more than 20 years working inside active surgical departments. At Centennial Hills Hospital in Las Vegas, it finished a full Stryker iSuite operating room renovation in seven days.

CONTACT OUR TEAM

TURNKEY OPERATING ROOM RENOVATION UNDER ONE CONTRACT

When equipment, medical gas and construction go to separate contractors, the facility team ends up managing the handoffs between them. KR Wolfe keeps those trades in-house. One team owns the schedule.

Equipment, Ceilings and Construction Under One Contract

Equipment, ceilings, electrical, mechanical and structural work sit under a single contract, delivered as design-build construction or bid-build. The equipment installation division handles booms and ceilings, with dedicated teams for surgical boom installation and modular ceiling installation.

Medical Gas Recertification Built Into the Phase Plan

Medical gas line extensions, cap-offs and new outlets are part of the renovation scope. Crews isolate each affected zone with valves while the rest of the hospital's system stays live. Pressure, cross-connection and purge testing start once piping and outlets are in. A third-party verifier then certifies the zone to NFPA 99 before the room takes its first case.

Level 4 ICRA Containment in Active Surgical Departments

KR Wolfe crews are trained for every ICRA class used in healthcare renovations, including Level 4. Inside an active surgical department, Level 4 calls for sealed containment barriers, HEPA-filtered negative air, separate crew entry and exit paths, daily debris removal, and decontamination before the room reopens.

PHASED OPERATING ROOM RENOVATION IN ACTIVE HOSPITAL

Each phase is scheduled from the hospital's clinical calendar:

  • The project team reviews daily case volume for each suite, identifies the highest-volume rooms, and picks the slower weeks for taking more rooms offline.
  • Crews map staff, patient and material paths, keep construction routes separate from clinical ones and set containment before demolition starts.
  • Technicians trained directly by manufacturers, including Stryker and Midmark, remove the old equipment and install the new.
  • A third-party verifier tests and recertifies each medical gas zone.
  • The project manager coordinates with the OR scheduler every day until the last room returns to service.

Step-by-step detail is in KR Wolfe's guide to planning an OR renovation without shutting down your surgical schedule.

Explore the planning approach →

Image (Operating room prepared for surgery)

TALK TO THE KR WOLFE HEALTHCARE RENOVATION TEAM ABOUT PHASING YOUR NEXT OR RENOVATION AROUND THE SURGICAL CALENDAR.

CONTACT OUR TEAM

INTEGRATED AND HYBRID OPERATING ROOM RENOVATION

Integrated suites and hybrid ORs put imaging, displays, surgical lights, and booms in the same room. Each system has to be mounted, powered, and connected before the room opens. KR Wolfe installs and integrates that equipment within the renovation scope, using manufacturer-trained technicians. Centennial Hills was a full Stryker iSuite, and the Stryker OEM partner page has more on that relationship.

Hospitals adding imaging to a surgical suite can start with KR Wolfe's guide to planning before building a hybrid operating room.

Learn about hybrid OR planning →

OPERATING ROOM RENOVATION PROJECTS

Image (Modern integrated operating room)

CENTENNIAL HILLS HOSPITAL, LAS VEGAS, NV

The hospital needed a full Stryker iSuite operating room renovation without taking its other suites offline. KR Wolfe removed and replaced the room's equipment, recertified the medical gas system, and maintained Level 4 ICRA containment throughout. The work took seven days, and the adjacent suites stayed in use.

Read the case study →

ST. FRANCIS HOSPITAL, ROSLYN, NY

KR Wolfe renovated 14 operating rooms at St. Francis Hospital as part of a turnkey project that began in January 2019. The team replaced outdated equipment with LED surgical lighting, new equipment management systems, and fully articulating anesthesia booms that position equipment, displays, medical gas, and power where surgical teams need them. KR Wolfe coordinated the work with hospital management, subcontractors and the general contractor.

Image (Modern integrated operating room)2

A TRUSTED PARTNER INSIDE ACTIVE SURGICAL DEPARTMENTS

Founded in 2007, KR Wolfe is a WBENC-certified, women-owned contractor. Contact the healthcare renovation team to start phase planning for your operating room renovation.

CONTACT OUR TEAM

OPERATING ROOM RENOVATION FAQS

How Should a Healthcare Facility Evaluate Contractors for OR Renovation Work? Ask specifically for operating room references, then confirm which ICRA classes the contractor has completed in active surgical departments. From there, ask how the contractor handles medical gas recertification, scope discoveries, and Joint Commission readiness during construction.
What Is the Role of a Construction Manager During a Hospital Operating Room Renovation?

The construction manager is the link between construction, clinical leadership, infection prevention and facility engineering. On KR Wolfe projects, a dedicated project manager talks with the OR scheduler daily, sets the phase boundaries, enforces ICRA protocols and keeps the hospital team updated as each phase closes.

How Do Contractors Ensure Medical Gas Recertification Is Handled During OR Renovation? The affected zone is isolated with valves, and the rest of the medical gas system stays in service. Once piping and outlets are in place, the zone goes through pressure, cross-connection, and purge testing. A third-party verifier, not the installing contractor, performs the final NFPA 99 certification before the suite returns to clinical use. KR Wolfe schedules that recertification inside the phase plan, ahead of the room's first scheduled case.
How Do Healthcare Construction Teams Manage Phased OR Renovation Across Multiple Surgical Suites? Rooms come offline in sequence. The order depends on each suite's case volume and on which weeks are slow enough to take more rooms down at once. Every phase gets its own containment, documented boundaries, and response protocol. KR Wolfe ran all 14 rooms at St. Francis Hospital as a single turnkey project.